,QVWDOODWLRQ2SHUDWLQJ,QVWUXFWLRQVCovering Model(s): Hercules 12, 20 & 30 Multfuel Boiler StovesOpen Vented Only Tested to EN 13240Th
Combustion Air RequirementsIn order for the stove to perform efficiently and safely there should be an adequate air supply into the room in which the
AssemblyThe diagram below shows the main components of the stove and how it can be broken down for transport purposes.s from 6 down to 1.JUL13GB Issu
Plumbing AdviceBoiler installations should only be carried out by qualified heating engineers who hold a HETAS wet systems certificate or equivalent.
Plumbing AdviceOpen Vented PlumbingIt is critical that this appliance is only connected to open vented systems, which must include a gravity circuit
Example Four Pipe Plumbing LayoutJUL13GB Issue 1 14
Example Three Pipe Plumbing LayoutJUL13GB Issue 1 15
Example Two Pipe Plumbing LayoutJUL13GB Issue 1 16
Controls LayoutThe stove is fitted with a number of controls which need to be correctly operated in order to light and maintain a fire. JUL13GB Issu
Controls ExplainedPrimary Air IntakesThe primary air intakes are located at the bottom of each door, they are in the form of spinners. Having the spi
Recommended FuelsThis appliance has obtained CE EN13240 approval for burning – * HETAS approved coal suitable for a closed appliance.* Split Wood log
ContentsIntroduction 3Packing List 3Health & Safety 4Specifications 5Dimensions 6Hearth Requirements & Clearances 7Chimney Requirements 8Comb
Lighting the StoveCuringOn initial firing you will notice a very pungent odour, this is caused through the curing of the paint, we recommend starting
Burning WoodWith kindling complete you are now ready to add your wood logs.Stage 4Place 3-5 small logs onto the bed of hot embers using the gloves pr
Warning NotesOver-FiringIt is extremely important that you do NOT leave all of the air controls in the fully open position for extended periods or ru
MaintainanceAsh RemovalThe ash pans can be removed by using the ash tool to hook it forward so that you can grasp the pan using the gloves provided.
Trouble-shootingSmoke comes out of the stove when the loading door is opened.D The chimney cavity into which the 150mm flue pipe has been installed m
Commissioning FormCommissioning Statement and Check-listStove Purchased From:_____________________________________________________Address:___________
Spare Parts(1) Base Casting (2) Legs (3) Boiler Section (4) Tertiary Air Tube (6) Baffle(7) Ash Pans (9) Grate Set (10) Left Door (11) Right Do
EC DeclarationDECLARATION OF CONFORMITYACCORDING TO DIRECTIVES 89/106/EEC (CONSTRUCTION PRODUCTS) BROSELEY FIRES LTD KNIGHTS WAY, BATTLEFIELD ENT
Annual Service Record1ST YEAR SERVICE completion date:
WarrantyThis appliance must be installed and commissioned by a fully qualified, registered engineer. A “Declaration of completion Certificate” must b
IntroductionMay we take this opportunity to thank you for choosing one of our cast iron, multifuel stoves. The term multifuel refers to the fact that
Health & SafetySpecial care must be taken when installing the stove such that the requirements of the Health and Safety at Work Act are met.Insta
SpecificationsIn the UK these stoves have been tested and approved to EN13240 as an intermittent heating appliance for burning manufactured or natura
Dimensions All dimensions are in millimetesJUL13GB Issue 1 6
Hearth Requirements & ClearancesThese appliances WILL require a full constructional hearth as laid out in building regulations approved document
Chimney Requirements This appliance must not be fitted into a chimney serving another heating appliance. It is most important that there is no obstru
Chimney RequirementsJUL13GB Issue 1 9
Komentáře k této Příručce